Thursday 16 September 2010

Tullie House Install Day#2

Hydroponics installation nearly complete and ready for tomorrow's opening. Thanks to John Stokes, Donna Marris (for sorting out those lovely holes) all at Tullie House, Chris Dobbinson, the Sparkies and Fiona Venables for helping get the grow room ready.

I'm wondering what the impact of walking through the gallery door straight into a stud wall with a door in it and a sign on that that says 'Restricted Access' will be for a visiting public! No one can go in without getting instruction from the gallery staff! It is really good to be included in the show. The other artist's work is terrific and I'm looking forward to meeting them. It was especially nice to see Jae Dudman today with whom I worked in 2000 (She has aged more gracefully than I have!)

Still thinking through the fact that we tried to run a 2645 watt draw through a supply fused to three amps! (Not what I asked for!). Co2 cylinder and release control system fitted and water pumps, pots and clay balls with timed nutrient piping installed. Input and output fans in and commisioned. Some work still to do on the white black sheeting and an irritating plug that I don't like! We could could grow something.... but we won't be. http://www.vistaprojects.co.uk/wp-content/uploads/2010/06/TH-Sedition-Programme-20pp-LoRez-v81.pdf



No comments:

Post a Comment